Shiroudi Swimming Pool
Project Data
Location:Tehran - South Moffateh
Architect:
Execution Year: 2010
Project Details
The first champion swimming pool in the country has been equipped with Siteco element lights with asymmetric light play. The intensity of the lighting is 1200 lux at water level and 1000 lux deluxe in the Dyou area. The compilation of this project was one of the most challenging issues.